Our Cyclone desanders have been commissioned on China’s largest Bohai oil & gas platform following its successful float-over installation
China National Offshore Oil Corporation (CNOOC) announced on the 8th that the central processing platform for the first phase of the Kenli 10-2 oilfield cluster development project has completed its float-over installation. This achievement sets new records for both size and weight of offshore oi...Read more -
Spotlight on WGC2025 Beijing: SJPEE Desanders Earn Industry Acclaim
The 29th World Gas Conference (WGC2025) opened on the 20th of last month at the China National Convention Center in Beijing. This marks the first time in its nearly century-long history that the World Gas Conference has been held in China. As one of the three flagship events of the International ...Read more -
CNOOC Experts Visit Our Company for On-Site Inspection, Exploring New Breakthroughs in Offshore Oil/Gas Equipment Technology
On June 3, 2025, a delegation of experts from China National Offshore Oil Corporation (hereinafter referred to as “CNOOC”) conducted an on-site inspection at our company. The visit focused on a comprehensive evaluation of our manufacturing capabilities, technological processes, and qu...Read more -
Desanders: Essential Solid Control Equipment for Drilling Operations
Introduction to Desanders A desander serves as a critical component in mining and drilling operations. This specialized solid control equipment utilizes multiple hydrocyclones to effectively remove sand and silt particles ...Read more -
PR-10 Absolute Fine Particles Compacted Cyclonic Remover
The PR-10 hydrocyclonic remover is designed and patented construction and installation for removing those extremely fine solid particles, which density is heavier than the liquid, from any liquid or mixture with gas. For example, produced water, sea-water, etc. The flow ...Read more -
New Year’s work
Welcoming 2025, we are constantly looking for innovative solutions to improve their processes, especially in the areas of sand removal and particle separation. Advanced technologies such as four-phase separation, compact flotation equipment and cyclonic desander, membrane separation, etc., are ch...Read more -
Participated Hexagon High-end Technology Forum for Digital Intelligent Factory
How to apply digital technology to effectively improve productivity, strengthen operational safety, and improve production efficiency and product quality is the concerns of our senior members. Our senior manager, Mr. Lu, attended the Hexagon High-end Technology Forum for Digital Intelligent Facto...Read more -
A foreign company visiting our workshop
In October 2024, an oil company in Indonesia came to visit our company for the strong interesting in the new CO2 membrane separation products which are designed and fabricated by our company. Also, we introduced other separation equipment stored at workshop, such as: hydrocyclone, desander, compa...Read more -
Users visit and inspect desander equipment
A set of desander equipment produced by our company for CNOOC Zhanjiang Branch has been successfully completed. The completion of this project represents another step forward in the company’s design and manufacturing level. This set of desanders produced by our company is liquid-solid sepa...Read more -
On-site membrane separation equipment installation guidance
The new CO2 membrane separation equipment produced by our company has been safely delivered to the user’s offshore platform in mid-to-late April 2024. According to user requirements, our company sends engineers to the offshore platform to guide installation and commissioning. This separati...Read more -
Lifting lug overload test before desander equipment leaves the factory
Not long ago, the wellhead desander designed and manufactured according to the user’s working conditions was successfully completed. Upon request, desander equipment is required to undergo a lifting lug overload test before leaving the factory. This initiative is designed to ensure that the...Read more -
Hydrocyclone skid successfully installed on offshore platform
With the successful completion of the Haiji No. 2 platform and Haikui No. 2 FPSO in the Liuhua operating area of CNOOC, the hydrocyclone skid designed and produced by our company has also been successfully installed and entered the next production stage. The successful completion of Haiji No. ...Read more